Crestron C2N-FTB FlipTop Control Center with Cresnet® Operations & Installation Guide
FlipTop Control Center with Cresnet® Crestron C2N-FTB Indicators PWR (Power) This LED illuminates when 24 volts DC is supplied to the C2N-FTB from
Crestron C2N-FTB FlipTop Control Center with Cresnet® CAUTION: Use only Crestron power supplies for Crestron equipment. Failure to do so could ca
FlipTop Control Center with Cresnet® Crestron C2N-FTB Identity Code Every equipment and user interface within the network requires a unique identity
Crestron C2N-FTB FlipTop Control Center with Cresnet® NOTE: The new Net ID code may also be verified by selecting Diagnostic | Report Network Devi
FlipTop Control Center with Cresnet® Crestron C2N-FTB CAUTION: This function does not prevent you from setting duplicate IDs. Be sure to check curre
Crestron C2N-FTB FlipTop Control Center with Cresnet® 1. Remove the four Allen screws that secure the button faceplate. 2. While holding adjac
FlipTop Control Center with Cresnet® Crestron C2N-FTB The cable management plate must be installed before mounting the C2N-FTB to a surface. The cab
Crestron C2N-FTB FlipTop Control Center with Cresnet® Example Cable End Cable Loops Through the Cable Management Plate NOTE: Ensure that the ca
FlipTop Control Center with Cresnet® Crestron C2N-FTB Cutout Dimensions 5.3125 in(5 5/16 in)(13.494 cm)6.375 in(6 3/8 in)(16.19 cm)MaximumRadius0.12
Crestron C2N-FTB FlipTop Control Center with Cresnet® 3. Install the four #10 screws in the mounting brackets (two screws per bracket). Refer to
This document was prepared and written by the Technical Documentation department at: Crestron Electronics, Inc. 15 Volvo Drive Rockleigh, NJ 07647 1-
FlipTop Control Center with Cresnet® Crestron C2N-FTB Consideration must be given if installed in a closed or multi-unit rack assembly, inside a clo
Crestron C2N-FTB FlipTop Control Center with Cresnet® Configuration Software Have a question or comment about Crestron software? Answers to freque
FlipTop Control Center with Cresnet® Crestron C2N-FTB Configuring with Crestron SystemBuilder The Crestron SystemBuilder interface guides you throug
Crestron C2N-FTB FlipTop Control Center with Cresnet® SIMPL Windows is the Crestron graphical, Windows®-based development tool for programming con
FlipTop Control Center with Cresnet® Crestron C2N-FTB A C2N-FTB in Slot 9 NOTE: The first C2N-FTB in a system is preset with a Net ID of 1E when it
Crestron C2N-FTB FlipTop Control Center with Cresnet® C2N-FTB Symbol in Programming Manager The Buttons module is built into the C2N-FTB. It consi
FlipTop Control Center with Cresnet® Crestron C2N-FTB C2N-FTB Buttons – Signal Descriptions SIGNAL TYPE AND NAME DESCRIPTION Digital Outputs: Butto
Crestron C2N-FTB FlipTop Control Center with Cresnet® Uploading and Upgrading NOTE: Crestron recommends that you use the latest software and tha
FlipTop Control Center with Cresnet® Crestron C2N-FTB The procedure in this section provides details for RS-232 communication between the PC and the
Crestron C2N-FTB FlipTop Control Center with Cresnet® 3. Select RS-232 as the connection type. Verify that an available COM port (COM 1 is shown
Crestron C2N-FTB FlipTop Control Center with Cresnet® Contents FlipTop Control Center with Cresnet®: C2N-FTB 1 Introduction ...
FlipTop Control Center with Cresnet® Crestron C2N-FTB Upload via Crestron Viewport 1. Verify that the procedure for “Communication Settings” that b
Crestron C2N-FTB FlipTop Control Center with Cresnet® Firmware Upgrade A firmware upgrade file has the extension .csf. To take advantage of all t
FlipTop Control Center with Cresnet® Crestron C2N-FTB “Select Network ID” Window NOTE: If problems arise when transferring any Cresnet file (touc
Crestron C2N-FTB FlipTop Control Center with Cresnet® Problem Solving The following table provides corrective action for possible trouble situatio
FlipTop Control Center with Cresnet® Crestron C2N-FTB Return and Warranty Policies Merchandise Returns / Repair Service 1. No merchandise may be re
Crestron C2N-FTB FlipTop Control Center with Cresnet® This page intentionally left blank.
Crestron Electronics, Inc. Operations & Installation Guide – DOC. 6338 15 Volvo Drive Rockleigh, NJ 07647 02.05 Tel: 888.CRESTRON Fax
Crestron C2N-FTB FlipTop Control Center with Cresnet® FlipTop Control Center with Cresnet®: C2N-FTB Introduction Features and Functions The C2N-
FlipTop Control Center with Cresnet® Crestron C2N-FTB C2N-FTB Block Diagram Specifications Specifications for the C2N-FTB are given in the followi
Crestron C2N-FTB FlipTop Control Center with Cresnet® Physical Description Refer to the physical views shown below. Top Open View Physical Dime
FlipTop Control Center with Cresnet® Crestron C2N-FTB Physical Dimensions - Front View Bottom View Back View Side View 4 • FlipTop Control
Crestron C2N-FTB FlipTop Control Center with Cresnet® Controls and Ports (Top) Buttons The C2N-FTB can have 10 to 20 engravable, replaceable, pr
Comments to this Manuals