Crestron AV2 Specifications Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
2-Series Integrated Dual Bus Control System Crestron AV2 & PRO2
c. Set the baud rate of the AV2/PRO2 control system to 115200, as
follows:
- Press and release the HWR button on the unit’s front panel.
- Press and hold the SWR button for approximately three to five
seconds. The Viewport console should display the following
message:
Viewport Message
- Release the SWR button.
d. If communication still cannot be established:
- Remove power from the control system.
- Press and hold the SWR button on the front panel of the
AV2/PRO2.
- Reapply power to the control system.
- The Viewport console should display the message shown
above.
- Release the SWR button.
e. Select Set Baud Rate on the Viewport Functions menu (or press
F8) and choose any baud rate from the drop-down list. This will
attempt to establish a connection at the indicated baud rate. If the
connection is successful, both the PC and the control system will
be set to the new baud rate.
f. Reinitialize the unit by recycling the power or pressing the HWR
button. If the connection is established, the Viewport console
should display some text and the <AV2> or <PRO2> prompt.
g. If communication still cannot be established, contact Crestron
customer service.
Compiling and Uploading a Program to the Control
System
After you have completed your SIMPL Windows program you must compile and
upload the program to the control system.
To compile the program, simply click the Convert/Compile button
on the
SIMPL Windows toolbar, or select Project | Convert/Compile (you can also press
F12). A status bar will indicate the progress of the compile operation. After the
operation is complete, a window will display information about the program such as
the number and type of signals, and memory usage.
The compiled program will be stored as an SPZ file in the same directory as the
source file. There are a number of ways to upload an SPZ file to the control system.
1. Immediately after compiling the program you have the option to transfer
the file to the control system.
22 Integrated Dual Bus Control System: AV2 & PRO2 Operations Guide - DOC. 5957A
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 51 52

Comments to this Manuals

No comments